| QUALITY ASSURANCE MANUAL 
  9.0 RECEIVING INSPECTION
 
 
  9.1 Copies of all purchase orders, pertinent to Section 6.1 and 6.2 of this manual shall
	    be submitted to the quality control department to determine compliance to contractual
	    obligations, and aid in determining which upcoming inspection functions will be necessary.
 
  9.2 All raw materials and outside processes may be subjected to inspection as directed by
	    the Quality Control Supervisor and the results entered on a "First Article Inspection
	    Form" (Form QC 010).
 
  9.3 Upon satisfactory inspection, all materials or parts will be acceptance stamped or
	    tagged and released to production.
 
  9.4 In cases where vendor parts or materials are found to be unacceptable, the receiving
	    inspector will write a "Reject Notice" (Form QG 011). The rejected parts or
	    material will be clearly identified by marking the reject tag number on the parts or
	    materials and/or attaching a "Reject Tag." The inspector will then notify the
	    Quality Control Supervisor for further action.
 
  9.5 ALL REJECTED PARTS OR MATERIALS WILL BE PLACED IN A DESIGNATED HOLDING AREA FOR
	    FURTHER DISPOSITION.
 
  9.6 Based on the information of the receiving inspection, the Quality Control Supervisor
	    will make an investigation. He will then notify the purchasing department and material
	    control. If it becomes necessary, the Quality Control Supervisor will contact and work
	    directly with the vendor to resolve any problems.
 
  9.7 Any parts or materials that have been rejected at receiving cannot be processed any
	    further, until disposition has been determined.
 
  9.8 ANY UNAUTHORIZED PERSONNEL REMOVING A REJECT TAG OR USING REJECTED PARTS OR MATERIALS
	    WILL BE SUBJECT TO DISCIPLINARY ACTION.
 |  |